Storeroom becomes roof

When we extended the roof of the church building in Muyange last year we used timber rather than the more expensive steel of the original structure. A recent rain storm caused considerable damage to the extended part of the roof which needed to be fixed right away. In order to save on material costs, the iron sheets from the store room which was used during construction were taken to replace the damaged sheets. So much for wondering what to do with the storeroom when the building is finally finished! Don’t you just love it when the solution to a problem is right next to it.